Burlington Fire Station No. 6

Burlington, NC
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
  • Stewart Cooper Newell Architects copyright 2020 ©
plus icon
close icon

Square Footage

14,536

Project Description

SCNA provided services for the design of the City of Burlington’s new fire station. The City provided surveying and site design services on an undeveloped piece of property.

The City desired to incorporate energy efficiency elements of the LEED process into the design to minimize the life cycle cost of the Fire Station.

This station emphasis on sustainability includes solar water heaters, high insulation values, increased natural daylighting with appropriate shading devices, enhanced lighting and HVAC controls. The City required the following features: three drive-through bays and training room.

Our Involvement

Architect of Record
Prev Next

Square Footage

14,536

Project Description

SCNA provided services for the design of the City of Burlington’s new fire station. The City provided surveying and site design services on an undeveloped piece of property.

The City desired to incorporate energy efficiency elements of the LEED process into the design to minimize the life cycle cost of the Fire Station.

This station emphasis on sustainability includes solar water heaters, high insulation values, increased natural daylighting with appropriate shading devices, enhanced lighting and HVAC controls. The City required the following features: three drive-through bays and training room.

Our Involvement

Architect of Record