SCN Architects worked in conjunction with the owner’s representative to provide economical, budget-conscious training aides for the Emergency Training Services complex. The burn building is designed for Class A combustible burns. The tower includes elevator doors and shafts, vertical and horizontal confined space drill components, electrical panel and valve lockout props, and floor, wall and ceiling tie-offs on all levels.
The total construction cost was $3.5 million.
Project Phases
- Phase 1 – Master Plan, Site Grading & Burn Building
- Phase 2 – Drill Tower
- Phase 3 – Service Building
- (Started Phase 1: 2000 – Completed Phase 3: 2005)
Capabilities & Features
- 4-Story Burn Building – 20,459 SF
- 4-Story Drill Tower – 5,074 SF
- Service Building – 8.990 SF
- Driving Track
- Hose Drying Tower
- Drafting Pits
- Oil Separator