Guilford Tech Fire Training Center

Jameston, NC
plus icon
close icon

Project Description

SCN Architects worked in conjunction with the owner’s representative to provide economical, budget-conscious training aides for the Emergency Training Services complex. The burn building is designed for Class A combustible burns. The tower includes elevator doors and shafts, vertical and horizontal confined space drill components, electrical panel and valve lockout props, and floor, wall and ceiling tie-offs on all levels.

The total construction cost was $3.5 million.

Project Phases

  • Phase 1 – Master Plan, Site Grading & Burn Building
  • Phase 2 – Drill Tower
  • Phase 3 – Service Building
  • (Started Phase 1: 2000 – Completed Phase 3: 2005)

Capabilities & Features

  • 4-Story Burn Building – 20,459 SF
  • 4-Story Drill Tower – 5,074 SF
  • Service Building – 8.990 SF
  • Driving Track
  • Hose Drying Tower
  • Drafting Pits
  • Oil Separator

Our Involvement

Architect of Record
Prev Next

Project Description

SCN Architects worked in conjunction with the owner’s representative to provide economical, budget-conscious training aides for the Emergency Training Services complex. The burn building is designed for Class A combustible burns. The tower includes elevator doors and shafts, vertical and horizontal confined space drill components, electrical panel and valve lockout props, and floor, wall and ceiling tie-offs on all levels.

The total construction cost was $3.5 million.

Project Phases

  • Phase 1 – Master Plan, Site Grading & Burn Building
  • Phase 2 – Drill Tower
  • Phase 3 – Service Building
  • (Started Phase 1: 2000 – Completed Phase 3: 2005)

Capabilities & Features

  • 4-Story Burn Building – 20,459 SF
  • 4-Story Drill Tower – 5,074 SF
  • Service Building – 8.990 SF
  • Driving Track
  • Hose Drying Tower
  • Drafting Pits
  • Oil Separator

Our Involvement

Architect of Record