Sandhills CC Emergency Services Training Center

Pinehurst, NC
plus icon
close icon

Square Footage

39 acre site (7.5 acres used in Phase I)

Project Description

Spanning multiple phases over several years, Stewart-Cooper-Newell Architects assisted Sandhills Community College in a series of critical stages to design, develop and build a new, regional fire and emergency services training center. Initially, the project began with site selection and master plan development. The site chosen was a steeply sloping, rural site near a crucial town reservoir. This location necessitated providing proper sedimentation and impoundment basins on the downhill-sloping portion of the site, to protect the reservoir.

Completed in August 2011, the center includes a commercial burn building, a training / drill tower, pumper test / drafting pits, and exterior training areas for vehicle extraction and burn props. The site also includes a 2-story, residential burn building with training for attic ventilation & attic access, and burn locations in the foyer, bedrooms, living areas and kitchen.

Capabilities & Features

  • Drill Tower
  • Control & Observation Tower
  • Residential Burn Building
  • Facility Master Plan
  • Vehicle Extraction Training

Our Involvement

Architect of Record (Multiple Phases)
Prev Next

Square Footage

39 acre site (7.5 acres used in Phase I)

Project Description

Spanning multiple phases over several years, Stewart-Cooper-Newell Architects assisted Sandhills Community College in a series of critical stages to design, develop and build a new, regional fire and emergency services training center. Initially, the project began with site selection and master plan development. The site chosen was a steeply sloping, rural site near a crucial town reservoir. This location necessitated providing proper sedimentation and impoundment basins on the downhill-sloping portion of the site, to protect the reservoir.

Completed in August 2011, the center includes a commercial burn building, a training / drill tower, pumper test / drafting pits, and exterior training areas for vehicle extraction and burn props. The site also includes a 2-story, residential burn building with training for attic ventilation & attic access, and burn locations in the foyer, bedrooms, living areas and kitchen.

Capabilities & Features

  • Drill Tower
  • Control & Observation Tower
  • Residential Burn Building
  • Facility Master Plan
  • Vehicle Extraction Training

Our Involvement

Architect of Record (Multiple Phases)